Q2 2024

Financial risk management in the construction projects

Abdussalam Shibani · Dyaa Hasan · Jalal Saaifan · Heba Sabboubeh · Mohamad Eltaip · Messaoud Saidani · Nawal Gherbal
10.1016/j.jksues.2022.05.001 392 المشاهدات 32 الاقتباسات
32
الاقتباسات
392
المشاهدات
الملخص غير متوفر لهذا المنشور.
الاستشهاد بهذا المقال (APA)
Abdussalam, S., Dyaa, H., Jalal, S., Heba, S., Mohamad, E., Messaoud, S., Nawal, G. (2024). Financial risk management in the construction projects. Journal of King Saud University - Engineering Sciences. https://doi.org/10.1016/j.jksues.2022.05.001
أبحاث ذات صلة
The impact of using rice husk ash as a replacement material in concrete: An experimental study
Asad A. Khedheyer Al-Alwan; Mustafa Al-Bazoon; Faten I.Mussa; Hayder A. Alalwan; · 2024
57
استشهاد
396
45
استشهاد
391
Electric vehicle speed tracking control using an ANFIS-based fractional order PID controller
Mary Ann George; Dattaguru V. Kamat; Ciji Pearl Kurian · 2024
40
استشهاد
394
Effectiveness of replacing cement partially with waste brick powder in mortar
Saif Saad Mansoor; Sheelan Mahmoud Hama; Dhifaf Natiq Hamdullah · 2024
37
استشهاد
394
Development of Dioscorea alata stem fibers as eco-friendly reinforcement for composite materials
Christian Emeka Okafor; Lawrence Chiedu Kebodi; Christopher Chukwutoo Ihueze; Sa · 2024
26
استشهاد
400
الوصول
عرض النص الكامل عبر DOI
نُشر في
الرقم الدولي ISSN 1018-3639
الربعية Q2
درجة المؤشر القياس العربي 91
التخصص Engineering & Technology
الناشر Elsevier / King Saud University
الدولة 🇸🇦 Saudi Arabia
عرض ملف المجلة →
المؤلفون
تفاصيل النشر
السنة 2024
اللغة English
أُضيف في 23 Jul 2026